Home / Projects / Al Maqam Palace · Roofing

Al Maqam Palace · Sandwich Panel Roof Works

Location Abu Dhabi, UAE Division Structural Steel

At Al Maqam Palace, Abu Dhabi, Costro delivered 2,000 m² of insulated sandwich panel roofing together with its supporting structural steel at Al Maqam Palace, combining supply, transportation, additional steel supports and installation into a single weather-tight roofing package across multiple locations on site.

Project Facts

Private estate propertyPrivate estate — client details withheld for confidentiality
Setting
Private palace estate
Roofing area
2,000 m²
Division
Structural Steel
Scope
Supply & Install

Delivered Across Multiple Disciplines

The Al Maqam Palace roofing package brought together structural steel and cladding scopes under one programme.

Sandwich Panel Roofing

2,000 m² of insulated sandwich panel roofing supplied and installed.

Structural Steel Support

Additional structural steel supports fabricated and fixed beneath the new roofing system.

Logistics

Transportation and delivery of panels to site, coordinated with the installation sequence.

Installation

Site installation and fixing of the steel and panel roofing system across three locations.

Delivery & Installation

Panels were transported and delivered to site, additional steel supports installed, and the new roofing fixed section by section.

Completed Roofing Works

Completed sandwich panel installation across three locations on the Al Maqam Palace site.

Project Detail

Government / Palace & Private Estates

Scope of Work

  • Supply & install 2,000 m² of insulated sandwich-panel roofing
  • Additional structural steel supports

Technical Details

  • 2,000 m² roofing area

Materials & Specifications

  • Insulated sandwich-panel roofing system

Engineering Approach

Roof structure and panel layout were coordinated with the existing structural steel to ensure correct falls, fixings and insulation continuity across the full roof area.

Quality & Inspection

Inspected at agreed hold points under a project ITP, incoming material verification, staged workmanship inspections and dimensional checks, closing out with a documented handover file: test records, as-builts and applicable warranties. See Quality & HSE for the full framework.

Results & Outcome

2,000 m² of insulated sandwich-panel roofing supplied and installed over new structural steel supports, with panel laps, fixings and flashings completed and the roof handed over weather-tight.